Page 18: A. pipe clearances to combustibles

Advertising
background image

Heat & Glo • Bravo • 704-902 Rev. F • 10/08

18

W A L L

H E AT

S H IE L D

H E A T

S H IE L D

3 in . T O P

C L E A R A N C E

W A L L

S H IE L D

F IR E S T O P

1 in . C L E A R A N C E

B O T T O M & S ID E S

Combustible Wall Penetration

Frame a hole in a combustible wall for an interior wall
shield fi restop, (Figure 6.2) whenever a wall is penetrated.
Use same size framing materials as those used in the wall
construction. The wall shield fi restop maintains minimum
clearances and prevents cold air infi ltration.

Non-Combustible Wall Penetration

If the hole being penetrated is surrounded by noncombus-
tible materials such as concrete, a hole with diameter one
inch greater than the pipe is acceptable.

Whenever a non-combustible wall is penetrated, the wall
shield fi restop is only required on one side and no heat
shield is necessary.

If your local inspector requires the wall shield fi restop on
both sides, then both wall shield fi restops must have a heat
shield attached to them.

Fire Risk.

Explosion Risk.

Maintain vent clearance to combustibles as
specifi ed.

WARNING

• Do not pack air space with insulation or

other materials.

Failure to keep insulation or other materials
away from vent pipe may cause fi re.

B. Wall Penetration Framing

Figure 6.1 Pipe Clearances

Figure 6.3 Exterior Wall Hole

* Shows center of vent framing hole for top venting. The

center of the hole is one (1) inch (25.4mm) above the
center of the horizontal vent pipe.

Figure 6.2 Horizontal Venting Clearances to Combustible Materials

B

A

10 in.

12 in.

Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm).
The heat shield is designed to be used on a wall 4 in. to 7-1/4 in. (102
mm to 184 mm) thick.
If wall thickness is less than 4 in. (102 mm) the
existing heat shields must be fi eld trimmed. If wall thickness is greater than
7-1/4 in. (184 mm) a DVP-HSM-B will be required.

A. Pipe Clearances to Combustibles

6

6

Vent Clearances and Framing

A*

B

87-3/4 in.

86-3/4 in.

1 in. CLEARANCE

AROUND VERTICAL

SECTIONS

3 in. TOP

CLEARANCE

1 in. SIDE AND

BOTTOM CLEARANCE