Removal and replacement procedures 36

Power cable management

Item

PSU cable label

Connects to

1

P1

PWR_CN on the

system board

2

P2

CN4 on the system
board

3

P3

Optical disc drive

4 P8

2

nd

hard drive

5 P9

1

st

hard drive

Hard disk drive

Hard drives installed in the server are labeled as HDD 1 and HDD 2, from left to right, when viewed
from the front of the server.
The drive bays can accommodate large form factor (LFF) non-hot-plug SAS or SATA hard drives. The

following drive capacities are supported.

Non-hot-plug SAS HDD – 72-, 146-, and 300-GB

Non-hot-plug SATA HDD – 80-, 160-, 250-, 500-, and 750-GB

IMPORTANT: SAS hard drives require that you first install the SAS controller board and SAS

HDD/LED cable option kits. For instructions on how to install these option kits, go to page 61.