Post-commissioning, Peak the satellite signal, 27 post-commissioning – Hughes DIRECWAY DW4020 User Manual

Page 39

Advertising
background image

Chapter 2 • Installing the indoor equipment

1031484-0001 Revision 2

27

Post-commissioning

In post-commissioning, you peak the satellite signal, attach the
DW4020 to the customer computer that has a functioning
Ethernet interface, and confirm the customer can surf the Internet.

Peak the satellite signal

1. Unplug the DW4020 power cord from the wall outlet or surge

protector.

2. Remove the phone line and network cable from the installer

laptop PC.

3. Remove the network cable from the Gateway and unplug the

USB cable from the receive modem.

4. Connect a long USB cable from the back of the receive

modem to the installer laptop PC.

5. Assemble and install the satellite antenna.
6. Place the outdoor pointing interface (OPI) in the receive

cable line if applicable.

7. Power on the DW4020.Select

Start

ProgramsDIRECWAY

Installer

Antenna Pointing.

The

Antenna Pointing - Antenna

Location

screen appears. See Figure 25.

8. Verify the ZIP code matches the antenna location and select

Next. The

Antenna Pointing - Receiver

screen appears. Check

the Longitude, Hemisphere, and Frequency values. See
Figure 26
.

Figure 25: Antenna Location; verify ZIP code

Advertising