Powering up and reading the dw4020 led display – Hughes DIRECWAY DW4020 User Manual

Page 97

Advertising
background image

Appendix C • Installing the DW4020 Manually

1031484-0001 Revision 2

85

Powering up and reading

the DW4020 LED display

After you have assembled the DW4020, plug it into a 110 V wall
outlet, power strip, or surge protector. The Gateway LED display
will cycle as shown in Table 12. The cycling completes in less
than a minute.

The transmit and receive modems have their own LEDs, which
show their status. These are described in The DW4020 LEDs on
page 86
.

Note that normal Gateway operation alone doesn't imply normal
DW4020 operation. The installation and commissioning process
may not have been completed or software download (DLL) from
the Network Operations Center (NOC) may not have been
completed. Additional status information is available via the User
Interface. See Chapter 3 – The User Interface, on page 33) and
the LEDs on the receive and transmit modems (see
Communicating with the Gateway through the serial port on
page 95
).

Note:

In countries outside North America, the DW4020 may be

plugged, with a physical adapter, directly into a 220 V outlet.
Different countries may have different standards and requirements.

Table 12: Gateway LED cycling at startup

LED condition

STATUS LED

READY LED

Off

Power off

Power off or startup
diagnostics not yet run
successfully

Steady Green

Normal operation

Running software
downloaded from NOC;
successfully
commissioned

Blinking Orange

Contact between GWH
and IRU over USB not
established; USB cable
not installed or some
other USB problem

Not applicable

Blinking Green

Not applicable

Not commissioned

Steady Red

Power on tests

Not applicable

Advertising