Refrigeration piping and line sizing, Figure 6. refrigeration piping diagrams, 10 door vault cooler – Heatcraft Refrigeration Products II User Manual

Page 7: Vault ice merchandiser, 10° vault storage freezer

Advertising
background image

7

Refrigeration Piping And Line Sizing

Refrigeration Piping And Line Sizing

The system as supplied by Heatcraft, was thoroughly cleaned and dehydrated at the factory. Foreign matter may
enter the system by way of the evaporator to condensing unit piping. Therefore, care must be used during
installation of the piping to prevent entrance of foreign matter. Install all refrigeration system components in
accordance with applicable local and national codes and in conformance with good practice required for the
proper operation of the system. The refrigerant pipe size should be selected from the tables in Refrigeration
System Installation Manual, Part Number 25001201. The interconnecting pipe size is not necessarily the same
size as the stub-out on the condensing unit or the evaporator.

The following procedures should be followed:

(a) Do not leave dehydrated compressors or filter-driers on condensing units open to the atmosphere any longer

than is absolutely necessary.

(b) Use only refrigeration grade (ACR) copper tubing, properly sealed against contamination.
(c) Suction lines should slope 1/4” per 10 feet towards the compressor (in direction of flow).
(d) Suitable P-type oil traps should be located at the base of each suction riser to enhance oil return to the

compressor.

(e) For desired method of superheat measurement, a pressure tap should be installed in each evaporator

suction line in the proximity of the expansion valve bulb.

(f) When brazing refrigerant lines, an inert gas should be passed through the line at low pressure to prevent

scaling and oxidation inside the tubing. Dry nitrogen is preferred.

(g) Use only a suitable silver solder alloy on suction and liquid lines.
(h) Limit the soldering paste of flux to the minimum required to prevent contamination of the solder joint internally.

Flux only the male portion of the connection, never the female. After brazing, remove excess flux.

(i)

Remove temperature sensor attached to suction line on Beacon II systems before brazing of the solder joint
internally. Flux only the male portion of the connection – never the female. After brazing, remove excess flux.

(j)

Wrap expansion valves with wet rags during brazing to the liquid line.

CAUTION:

If the temperature gets too high, these components may be damaged. Heat absorbing

compounds or wet rags must be used to protect the expansion valve when brazing to the refrigerant
piping/line connections, and the suction line sensor must be removed per above instructions.

(k) Do not use “bull head” tees. This will cause oil return problems and can cause poor performance.
(l)

If isolation valves are installed at the evaporator, full port ball valves should be used.

7/8”

3/8”

1/2”

L

L

S

S

SLOPE DOWN TO UNIT

PITCH AWAY FROM UNIT

1/2” LIQUID LINE

1-1/8” SUCTION LINE

TO MCCU

UNIT ON ROOF

BRACE DOWN
EVERY 6.0 FT.

PITCH DOWN

TOWARD UNIT

ROOF PENETRATION BY OTHERS

(SEE ARCH. PLANS)

1/2” LIQUID LINE

BEACON

ELECTRIC

EXPANSION

VALVE

(TYP.)

FACTORY

MOUNTED

1-1/8” SUCTION LINE

INSULATED WITH 3/4”

WALL ARMAFLEX OR EQUAL

SLOPE DOWN TO UNIT

PITCH AWAY FROM UNIT

3/8” LIQUID LINE

SUCTION LINE

BEACON

ELECTRIC

EXPANSION

VALVE

(TYP.)

FACTORY

MOUNTED

3/8” LIQUID LINE

ROOF PENETRATION BY OTHERS

(SEE ARCH. PLANS)

PITCH DOWN

TOWARD UNIT

BRACE DOWN
EVERY 6.0 FT.

TO MCCU

UNIT ON ROOF

1/2” SUCTION LINE

INSULATED WITH 3/4”

WALL ARMAFLEX OR EQUAL

7/8”

1/2”

3/8”

S

S

S

L

PIPING DIAGRAM FOR THE

(R22) MEDIUM TEMPERATURE COOLER

REFRIGERATION SYSTEM

10 DOOR VAULT COOLER

NOT TO SCALE

PIPING DIAGRAM FOR THE

(R404a) LOW TEMPERATURE FREEZER

REFRIGERATION SYSTEM

VAULT ICE MERCHANDISER

NOT TO SCALE

PITCH AWAY FROM UNIT

SUCTION LINE

BEACON

ELECTRIC

EXPANSION

VALVE

(TYP.)

FACTORY

MOUNTED

3/8”

5/8”

S

S

L

5/8” SUCTION LINE

INSULATED WITH 3/4”

WALL ARMAFLEX OR EQUAL

3/8” LIQUID LINE

ROOF PENETRATION BY OTHERS

(SEE ARCH. PLANS)

PITCH DOWN

TOWARD UNIT

BRACE DOWN
EVERY 6.0 FT.

TO MCCU

UNIT ON ROOF

PIPING DIAGRAM FOR THE

(R404a) LOW TEMPERATURE FREEZER

REFRIGERATION SYSTEM

-10° VAULT STORAGE FREEZER

NOT TO SCALE

3/8” LIQUID LINE

SLOPE DOWN TO UNIT

Figure 6. Refrigeration Piping Diagrams