Assembly – Heatiator Heatilator BH60 User Manual

Page 6

Advertising
background image

6

Assembly

Boiler Kit Materials: (Refer to page 2)

List of items contained within the boiler kit shipped with

the unit.

1 - Control board cover

1 - Access cover (Hopper Swing Plate Knob)

5 - Spring Handles

1 - 1/2” Boiler Drain

1 - 3/4” Safety Relief Valve

1 - 1/2” Aquastat Well

1 - 1/2” Dual Temperature/Pressure Gauge

1 - 100ft. Sensor Cable (Outdoor Air Sensor)

1 - Outdoor Air Sensor

1 - Flue Tunnel Weldment

1 - Combustion Blower Assembly

1 - Heat Shield (Comb. Blower)

2 - UY Connectors

2 - Terminals 1/4 Female

1 - #8 X 1/2” TEK

3 - 1/4-20 X 5/8” Wing Screw

4 - 1/4” Lock Washer

4 - 1/4-20 Nuts

Installation of the Flue Tunnel Weldment,

Combustion Blower and Wiring, ESP and Heat

Shield:

Step 1: First install the flue tunnel weldment by

aligning the (4) studs with the (4) holes in the ash

chamber base. Fasten the (4) nuts and lock washers

provided, to the studs by removing the access cover on

the secondary ash chamber.

Step 2: Place the combustion motor onto the flue tunnel

weldment and tighten the (3) wing screws provided.

Step 3: Insert the Exhaust Sensing Probe (ESP) into the

1/8” hole provided on the flue pipe stub. Fasten with

the (1) #8x1/2” TEK screw also provided. ESP will be

taped to the sheet metal jacket for shipping purposes.

Step 4: Connect the flex conduit 90 degree elbow(Not

Shown) to the heat shield in the hole provided. Then

connect the (3) wires from the combustion blower with

the (3) wires in the flex conduit by using the push-on

connectors and matching the wire colors as follows:

Red to Black, White to White and Green to Green.

Step 5: Place Heat Shield over combustion blower and

align the swell latches with the holes in the sheet metal

and tighten.

NOTE: Refer to Fig’s 22, 23, and 24 located on page 31 of this manual.

Flue Tunnel Weldment

Heat Shield

ESP

Combustion Blower