Caution, 7 2.2.3 leading in cables to the processor unit – Furuno FR-2115-B User Manual

Page 26

Advertising
background image

2-7

2.2.3 Leading in cables to the processor unit

Cables are led in to the processor unit through the cable clamp at the rear of the unit. Use the

shielding foam (supplied) as below to protect against noise radiation.

Pan-head screw
M4X8

Hex bolt
M5X12 SUS
2 pcs

Hex bolt
M5X35 SUS
2 pcs

Hex bolt
M5X35 SUS
2 pcs

(A) Rear clamp
base

(B) Power clamp

(Aluminum)

(C) Signal clamp

(Aluminum)

(D) Rear clamp
plate

Cable position in cable clamp

(Processor unit, rear view)

PWR

ANT

Log*

Control
unit

Nav equipment
(Gyro, etc.)

Slave display

Monitor

(Construction of

cable clamp)

(B) Power clamp

(Aluminum)

(C) Signal cable

(Aluminum)

(D) Rear clamp plate

(A) Rear clamp base

Rear cable entrance

Cable

Shielding foam

(Processor unit, right-hand side view)

(Processor unit, rear view)

Make sure shielding foam contacts rear chassis.

Navigator*

* When no log or nav equipment is
installed, insert rubber plug
(supplied) to the left of keyboard
cable to hold the cable in place.

Rubber plug

Figure 2-10 Cable clamp position

Place shielding foam between cables, and then attach foam to aluminum clamps.

Fill unused clamp holes with shielding foam.

Connect a ground wire between the earth terminal on the processor unit and ship's

superstructure.

Ground the equipment to
prevent electrical shock
and mutual interference.

CAUTION

Advertising