Wiring, 1 interconnection – Furuno FAR-2827 User Manual

Page 25

Advertising
background image

2-1

2. WIRING

Wiring consideration

To lessen the chance of picking up electrical interference, avoid where possible routing
the signal cable near other onboard electrical equipment (radars, transmitting radio
antennas, etc.) Also avoid running the cable in parallel with power cables. When crossing
with other cable, the angle should be 90°to minimize the magnetic field coupling.

The signal cable run between the antenna and processor units is available in lengths of
15 m (standard), 30 m and 50 m. Whatever length is used it must be unbroken; namely,
no splicing allowed. Use the signal cable as short as possible to minimize attenuation of
the signal.

The radar should be connected to an emergency power source, as required by SOLAS
II-1.

2.1 Interconnection

Processor unit

: Cable requires fabrication

24 VDC or

100-115 VAC/220-230 VAC

Antenna unit

TB801
TB802

Monitor unit

Control unit

(RCU-014 or RCU-015)

Control unit

(RCU-016)

RW-9600
15/30/40/50 m
(Max.100 m)

DPYC-2.5

XH10P-W-5P-A
L=10/20/30m

DPYC-2.5 for AC set
DPYC-6 for DC set

Memory

Card

I/F Unit

CU-200-FAR

XH10P-W-6P L=1.5/10/20/30m*

24 VDC or

100-230 VAC

DVI-D/D SINGLE LINK 5M, 5/10 m

F4

F3

F2

F1

Junction Box
RJB-001*

Junction Box
RJB-001*

*: If the length of the antenna cable is more than 100m,
use Junction box RJB-001. However, the maximum length is 300m.

Standard Interconnection

Advertising