Caution – Furuno FAR-2827 User Manual

Page 34

Advertising
background image

2. WIRING

2-10

Cable fabrication for the cables connected to the 03P9342 board

x

Signal cable RW-9600 (Between antenna unit and processor unit)

Shield

Armor

Clamp here by cable clamp.

Vinyl tape

After exposing cores,
wind shield around the armor.

Vinyl sheath

Coaxial cable

6

60

450

5

Conductor

5 9

Coaxial cable

14

Fold back shield.

x

Other cables for optional units
Use TTYCS-1 or TTYCS-4 (Japan standard cable) or equivalent.

Conductor

S = 0.75 mm

φ = 1.11 mm

2

TTYCS-1

Armor

Shield

Sheath

φ =

10.1 mm

Conductor

S = 0.75 mm

φ = 1.11 mm

2

TTYCS-4

Armor

Shield

Sheath

φ = 16.3

mm

60: Peel paint.

L

5

Shield

Armor

Clamp here by cable clamp.

Vinyl tape

After exposing cores,
wind shield around the armor.

L= Depends on equipment
connected. Measure at
the processor unit.

6

Wiring for Coaxial cable

CAUTION

Clamp shied with bracket.

Tighten conductor with screw.

Procedures
1. Twist the conductor.
2. Press the terminal opener downward.
3. Insert the wire to hole.
4. Remove the terminal opener.
5. Pull the wire to confirm that it is ecure.

Terminal opener

Wiring for WAGO connector

WAGO connector

Wire

Twist

Press downward.

Do not use crimp-on lug to prevent
contact resistance from increasing.

Advertising