Installation – GSI Outdoors AUTOFLOW 2TF User Manual

Page 26

Advertising
background image

2000 Autoflow

26

INSTALLATION

Drying Chamber Low-Level Rotary Switch Installation

1)

Drill a 2” diameter hole through the
roof panel at the location shown in
figure 8.

See component placement on
page 9 for proper placement in
relation to fill auger.

2)

Use the mounting plate as a pattern and
drill four 3/8” holes through the roof
panel at the switch location so the plate
can be bolted to the roof.

3)

Attach the flex coupling to the rotary
switch power pack using a roll pin.

4)

Apply teflon tape or pipe sealant (not
included) to the rotary switch power
pak threads and thread the rotary
switch power pack into the mounting
plate coupling.

5) Make sure that the conduit hole is at

6)

Caulk the underside of the mounting
plate and on all sides of the 2” hole.

7)

Bolt the assembly to the roof panel.

8)

Attach the shaft extension according to
figure 9.

9)

Apply teflon tape or pipe sealant (not
included) to the shaft guard.

10) Thread to underneath side of mounting

plate.

11) Add the 1/4” drilled coupling to the

shaft extension using the cotter pin.

12) Attach the 1-vane paddle to the flex

coupling as shown in figure 9.

right angles with the roof panel ribs or
facing towards the eave.

Figure 8

Advertising
This manual is related to the following products: