E1 facility termination – Multi-Tech Systems RAS96 User Manual
Page 53
Advertising
![background image](/manuals/114142/53/background.png)
5
E1 Daughter Card
CommPlete Communications Server
45
E1 Facility Termination
The E1 facility termination typically enters the customer’s premises as two wire pairs
for data. Figure 5 shows the RJ-48C connector, and Table 2 shows its pin configuration.
Figure 5. RJ-48C connector.
Table 2. RJ-48C Pin Configuration
Pin
Signal
1
Tip 1 (Receive from network)
2
Ring 1 (Receive from network)
3, 6
No Connection
4
(Transmit to network)
5
(Transmit to network)
7, 8
No connection
Advertising