Operational checks – Manitowoc Ice Q130 User Manual

Page 20

Advertising
background image

Operation

Section 3

3-4

Part Number 000001130 12/08

Operational Checks

GENERAL

Your Manitowoc ice machine was factory-operated and
adjusted before shipment. Normally, a newly installed ice
machine does not require any adjustment.

To ensure proper operation, always follow these
Operational Checks when starting the ice machine:

for the first time

after a prolonged out of service period

after cleaning and sanitizing

Routine adjustments and maintenance procedures
outlined in this manual are not covered by the warranty.

SIPHON SYSTEM

To reduce mineral build-up and cleaning frequency, the
water in the sump trough must be purged during each
harvest cycle.

When the water pump de-energizes the level in the
water trough rises above the standpipe starting a siphon
action. The siphon action stops when the water level in
the sump trough drops. When the siphon action stops,
the float valve refills the water trough to the correct level.

Siphon System Check

Follow steps 1 through 6 under water level check.

WATER FLOAT VALVE CHECK

Before water will flow into the water trough the float
valve shut-off must be in the OPEN position.

Water Level

WATER

LEVEL

SIPHON

CAP

STANDPIPE

DRAIN

PRESS TO

OPEN

PRESS TO

CLOSE

Advertising