John Deere OMPC20964 User Manual

Page 122

Advertising
background image

RTK Base Station Setup

OUO6050,0002277

–19–27NOV06–6/6

PC9392

–UN–23OCT06

A—Receiver

When installing a receiver (A) on a shed, grain leg, water
tower, or other tall structure, ensure the receiver is 2 m (6
ft) above the peak of the structure. This placement will
help prevent multipathing of the receiver.

35-15

121907

PN=122

Advertising