Connections and components – SMC Networks Barricade User Manual

Page 6

Advertising
background image

Page 3

Connections and Components

All connections and switches are on the rear panel. Please take a few minutes to fa-
miliarize yourself with your new Barricade.

Figure 1: Barricade Rear Panel

Power Switch

This is a spring-loaded "Soft Switch".
If Off, press once to turn On.
If On, press once to start the Disk Shutdown sequence.
During Shutdown, the Ready LEDs will blink.

100Base LEDs

These LEDs match the LAN (Hub) connectors. If the
matching LAN connector is using 100BaseT, the LED will
be ON. If using 10BaseT, the LED will be OFF.

LAN (Hub) ports

These Ethernet connectors are for the PCs and other devices
on your LAN. Both 10BaseT and 100BaseT connections can
be used simultaneously.

Note: If Port 7 is used, then the "Uplink" port (see below)
can NOT be used.

Uplink Port

Use this port only to connect to a standard port on another
Hub. The other Hub can be either 10BaseT or 100BaseT.

Note: If the "Uplink" port is used, then Port 7 can NOT be
used.

Link LEDs

These LEDs match the LAN (Hub) connectors. If the
matching LAN connector is in use, the LED will be ON.

Power Input

Connect the supplied power adapter here.

Advertising