Installation, Unpacking checklist – Sharp UX-340LM User Manual

Page 11

Advertising
background image

9

1. Ins

tall

a

tion

1. Installation

Unpacking Checklist

If any are missing,
contact your dealer
or retailer.

Before setting up, make
sure you have all of the
following items.

Original
document
support

Handset

Handset
cord

Gears (4)

Imaging film
(initial starter roll)

Paper tray
extension

Rapid key
labels

Operation
manual

Telephone
line cord

Imaging
film cartridge

Points to keep in mind when setting up

Do not place the
machine in direct
sunlight.

Do not place the
machine near
heaters or air
conditioners.

Keep dust away from
the machine.

Keep the area
around the
machine clear.

About condensation

If the machine is moved from a cold to a warm place, it is possible that condensation
may form on the scanning glass, preventing proper scanning of documents for
transmission. To remove the condensation, turn on the power and wait
approximately two hours before using the machine.

all_ux340lm.book Page 9 Tuesday, November 28, 2000 3:09 PM

Advertising