Sagem 3p@c – Sagem 4450E User Manual

Page 74

Advertising
background image

SAGEM 3P@C

3P@C Installation Manual

Page 4-13

Reproduction and communication in any form prohibited without the written permission of SAGEM SA

Figure 4-17 Positions of the bolts to be fastened

Wire outlet

Bolt of the pressure

plate assembly

Antistatic floor

Height-locking

bolt (middle)

Height-locking

bolt (side)

Expansion bolt

Sequence of fastening the bolts: Bolt of the pressure

plate assembly ¡ú Expansion bolt ¡úHeight-locking bolt

(middle) ¡úHeight-locking bolt (side)

1.1.1.44

1.1.1.44

1.1.1.44

1.1.1.44

Fix the cabinet

A. Level the cabinet

Restore all the antistatic floorboards to their original state. Loosen all the bolts on the pressure plate assemblies
and remove the pressure plate assemblies. Push the cabinet to the predefined position (the cabinet feet must
coincide with their position marks) and screw the four feet with a spanner, so that the bottom surface of the
cabinet is 73 mm away from the floor and all cabinets are aligned. Place a horizontal ruler at the plane at the top
of cabinet in two perpendicular directions, to check its horizontal level. Fine tune the cabinet feet so that the
cabinet becomes level and then tighten the locking nuts of the cabinet feet.

B. Fix the cabinet

Put back the pressure plate assembly again, so that the pressure plate presses against the cabinet feet and use
a torque wrench to fasten the pressure plate assembly bolt to 45 Nm.

Note

Please skip Step C below to install a single cabinet.

C. Cabinet top fixation

When two (or more) cabinets are combined, it is necessary to connect the combined cabinets. Figure 4-8 shows
the position of the inter-cabinet connecting board before the cabinets are combined. Release the inter-cabinet
connecting board of the cabinet on the right and install it in the way as shown in Figure 4-9. Figure 4-18 shows
the effect after two cabinets are combined.

Advertising