Sagem 4450E User Manual

Page 81

Advertising
background image

SAGEM 3P@C

3P@C Installation Manual

Page 4-20

Reproduction and communication in any form prohibited without the written permission of SAGEM SA

Figure 4-27 Completion of the installation of a single general chassis

Next, repeat the above operations to install multiple general chassis of 3P@C 4450E in the cabinet.

prompt

1. When installing multiple general chassis of 3P@C 4450E
in the cabinet, the installation of the first one in the cabinet
can start from the top installation position or the bottom one
of the cabinet.
2. If upward cabling is adopted on site, the cabling should
be arranged from the bottom up from the bottommost
general chassis in the cabinet. Otherwise, the cabling
should be arranged from the top down from the topmost
general chassis in the cabinet.

Advertising