What is next – Nortel Networks Server 600r User Manual

Page 43

Advertising
background image

Connecting the server to power

43

Note: When the 600r server is plugged into an AC outlet with power,
the server automatically powers on. If there is a power outage and the
600r server loses power, the server automatically powers up after power
is restored.

Step

Action

1

Plug the server AC power cord into the server rear panel.

2

Plug the other end into an approved wall receptacle or power bar.

—End—

What is next?

Proceed to the Installation and Configuration Task List (NN44200-306) for
details.

Nortel CallPilot

600r Server Hardware Installation

NN44200-307

01.03

Standard

5.0

14 May 2008

Copyright © 2007-2008, Nortel Networks

.

Advertising