What is next – Nortel Networks Server 600r User Manual
Page 43
Advertising
Connecting the server to power
43
Note: When the 600r server is plugged into an AC outlet with power,
the server automatically powers on. If there is a power outage and the
600r server loses power, the server automatically powers up after power
is restored.
Step
Action
1
Plug the server AC power cord into the server rear panel.
2
Plug the other end into an approved wall receptacle or power bar.
—End—
What is next?
Proceed to the Installation and Configuration Task List (NN44200-306) for
details.
Nortel CallPilot
600r Server Hardware Installation
NN44200-307
01.03
Standard
5.0
14 May 2008
Copyright © 2007-2008, Nortel Networks
.
Advertising