Installing the breaker interface panel

This section covers the following topics:

•

“Installing the hardware

” next

•

“Connecting cables to the chassis power supplies” on page 38

•

“Routing power supply cables to the BIP” on page 47

•

“Connecting the ground cables to the rack grounding strip” on page 48

•

“Connecting the power supply cables to the BIP” on page 49

•

“Connecting DC input power feeds to the BIP” on page 52

•

“Replacing covers” on page 59

•

“Installing shelf alarm cables” on page 61

Installing the hardware

Before beginning the BIP hardware installation, ensure that you:

•

Always install the BIP in the uppermost position in the rack to allow for
maximum convection cooling requirements.

•

Ground the rack to the same grounding electrode used by the power service in
the area.

The ground path must be permanent and must not exceed 1 ohm of resistance
from the rack to the grounding electrode.

Warning: Ensure that the DC power source is off or disconnected at the
remote end before you perform any of the steps in this section. You may
need to switch a circuit breaker off or turn off power at the DC input
source. Be sure that the DC input source power is locked out and tagged.

Note: The 8004DC power supply operates with the BIP. The BIP does
not support the 8005DC power supply.