4. How Auto Test Works

Creating the Cable Test Schedule in Plan-Um, uploading it to the

Validator, and running Auto Test is the easiest and most efficient way

to verify cables. See the Uploading/Downloading Jobs section of this

manual (or the Plan-Um Software Instructions) for detailed instructions

on how to upload and download job information and test results between

Plan-Um and the Validator.

When you have uploaded a job from Plan-Um to the Validator-NT main

unit, the job will appear in the list on the

Job Manager screen. To run an

existing job, you must first open it from the Job Manager before using it

with Auto Test.

When you open a job, the Auto Test screen appears. This screen gives

you five options:

Cable Test Schedule, Site Information, Contractor

Information, Custom Cable Definitions and Job Utilities. See Figure

4.1 for a Flowchart of the Auto Test process.