10. Application Notes for Typical Field Use

10.1. New Job, New Cable Installations

1. A Layout using the Plan-Um software will be created conforming

to the customers’ facility or residence and a job id created.

2. Cables will be chosen and run between agreed upon ports and a

Comm. Panel or Patch Panel.

3. Check Cable Test Schedule against the Layout to make sure all

ports are connected correctly.

4. The Job File from the Plan-Um software will be uploaded to

the Validator-NT Main unit. The Job File can then be accessed

through the Job Manager on the Main Menu Screen of the

Validator-NT.

5. The Cable Test Schedule can be sorted so that all CAT 5E

cables are listed first or all CAT 5 etc. This groups the types of

cables for quicker testing at the Comm. or Patch Panel.

6. Once all tests are done, upload the finished Cable Test Schedule

to the laptop or PC and print this as an End of Job report

showing all the cable runs and PASS/FAIL results. This should

be attached to a copy of the customer layout for comparison and

final checking prior to billing.

10.2. New Job, Previously Installed Cables

1. Create a layout using the Plan-Um software re-creating the

customers’ cabling system using port and cable icons in Plan-

Um.

2. Name the job and upload it to Validator-NT for testing

3. Print out the finished Cable Test Schedule as an End of Job

report for the customer to see what was tested and results.

Validator

TM

Application Notes