Rigging and Unit Handling

Before lifting the unit or modular
component, determine the approximate
center of gravity for lifting safety. See
Figure I-PC-5 for assembled modular
units and Figure I -PC-6 for split-apart
units. The center of gravity may vary
slightly within the gravity block
depending on unit options.

Ensure lifting equipment capacity
exceeds unit weight by an
adequate safety factor to prevent
injury, death, or unit damage.

Always test-lift the unit to determine the
exact unit balance and stability before
hoisting it to the installation location. See
Figures I-PC-7 and I-PC-8 for typical
rigging procedures and proper rigging
equipment usage.

To prevent injury or death and
unit damage, always test-lift the
unit to determine actual center of
gravity.

See Figures I-PC-5 and I-

PC-6.

Pre-Installation
Considerations

Installation

WARNING

!

ƽ

ƽ

ƽ

ƽ

ƽ

WARNING

!

Fan Section Only

Compressor Section Only

Advertising