Pre-installation considerations, Installation – Trane IntelliPak SCWG 020 User Manual

Page 13

Advertising
background image

SCXG-SVX01B-EN

13

Pre-Installation
Considerations

Rigging and Handling

Unit Shipping
1. Position rigging sling under wood

shipping skid.

2. Use spreader bars to avoid unit

damage.

3. When using a forklift, exercise caution

to prevent unit damage.

4. Use the standard fork length to lift one

end and drag or pull unit while skidding
the opposite end.

5. The unit center of gravity will fall within

center of gravity block at various
locations depending on unit options.

6. Use hooks to lift fan section only. Do not

hook into open channels to lift unit.

7. See unit nameplate for unit weight.
8. Do not stack units.

Do not use hooks to lift unit or
hook into open channels to lift
unit. This could cause unit
damage.

Installation

ƽ

ƽ

ƽ

ƽ

ƽ

CAUTION

!

Figure I-PC-8. Split-apart modular unit proper rigging.

Figure I-PC-7. Assembled modular unit proper rigging.

Fan Section

Advertising