Toshiba RAV-SM1101BT-E User Manual

Page 92

Advertising
background image

90

No.

†

Part name

Drain pump

Procedure

1. Remove the drain pan and float switch.
2. Remove the set screws (3 positions) of

fixing drain pump plate and main unit.

3. Remove the set screws (3 positions) of

fixing drain pump plate and drain pump.

Remarks

‡

ˆ

1. Remove the set screws (5 positions) and

check port cover (right side).

2. Pull out the sensor is inserted into pipe of

the heat exchanger.

1. Take down the main unit and then treat

the heat exchanger on the floor.

2. Remove the drain pan.
3. Remove the check port cover (right side).

4. Remove the set screws (6 positions) and

check port cover (left side).

5. Remove the set screws (2 positions) of

fixing heat exchanger and main unit (left
side).

6. Remove the set screws (7 positions) of

fixing heat exchanger and main unit (front
right side).

TC, TCJ sensor

Heat exchanger

Drain pump holder

Screws (Fixing drain pump holder)

Drain pump

Screws (Fixing plate and drain pump)

Drain pump holder

(6) -3. View from reverse side of drain pump

Checking port cover (Right side)

Screws (Fixing check port cover (Right side))

Check port cover (Left side)

Screws (Fixing check port cover (Left side))

Main unit (Left side)

Screws (Fixing heat exchanger)

Screws

Main unit (Front side)

6

6 -2

6 -3

7 -1

8 -4

8 -5

8 -6

Advertising
This manual is related to the following products: