Wayne-Dalton TORSION SPRING 9800 User Manual

Page 11

Advertising
background image

Please Do Not Return This Product To The store. Call us Directly! Our trained technicians Will answer your questions and/or Ship any Parts

you May Need. you can reach us toll free at

1-888-827-3667 for Consumer assistance or online at www.wayne-dalton.com

11

tools Needed:

Installation

1

IMPORTANT: REaD INStRuCtIONS tItlED “P4” “REMOVING thE OlD DOOR” ON PaGE 9 aND “P5” “PREPaRING thE OPENING” ON
PaGE 10 bEfORE attEMPtING DOOR INStallatION.

IMPORTANT: StaINlESS StEEl OR Pt 2000 COatED laG SCREWS MuSt bE uSED WhEN INStallING CENtER bEaRING bRaCkEtS,
END bRaCkEtS, jaMb bRaCkEtS, OPERatOR MOuNtING/SuPPORt bRaCkEtS aND DISCONNECt bRaCkEtS ON tREatED luMbER
(PRESERVatIVE-tREatED). StaINlESS StEEl laG SCREWS aRE NOt NECESSaRy WhEN INStallING PRODuCtS ON uNtREatED
luMbER.

NOTE: It is recommended that 5/16” x 2” lag screws be pilot drilled using a 3/16” drill bit, and 1/4” x 2” lag screws and 1/4” x 1-1/2”
lag screws be pilot drilled using a 1/8” drill bit, prior to fastening.

Attaching fully Adjustable

flagangle to vertical Track

None

hand tighten the flagangle to the
vertical track using (2) 1/4”- 20 x 5/8”
carriage bolts and (2) 1/4”- 20 flange
hex nuts. Secure the flange nuts after
flagangle spacing is complete (Step 9).

(2) 1/4”- 20 x 5/8”

CaRRIaGE bOltS

(2) 1/4”- 20

flaNGE hEx NutS

fully

aDjuStablE

flaGaNGlE

VERtICal

tRaCk

Advertising