Wayne-Dalton TORSION SPRING 9800 User Manual

Page 20

Advertising
background image

Please Do Not Return This Product To The store. Call us Directly! Our trained technicians Will answer your questions and/or Ship any Parts

you May Need. you can reach us toll free at

1-888-827-3667 for Consumer assistance or online at www.wayne-dalton.com

20

tools Needed:

tools Needed:

Torsion End bearing brackets

End bearing brackets are right and left.
using the upper slots in the end bearing
bracket, position above the flagangle
and secure the end bearing bracket to
the horizontal angle using
(2) 3/8”- 16 x 3/4” hex head bolts and
(2) 3/8”- 16 nuts.

Once the bracket is secured to the
horizontal angle, secure the top of the
end bearing bracket to the jamb using
(2) 5/16” x 2” lag screws. Repeat for
other side.

NOTE: Right and left hand is always
determined from inside the garage
looking out.

Power Drill

7/16” Socket

Driver

9/16” Socket

Ratchet Wrench

9/16” Wrench

lEft END bEaRING bRaCkEt

hORIzONtal aNGlE

(2) 5/16” x 2”

laG SCREWS

(2) 3/8”-16 x 3/4”

hEx hEaD bOltS

(2) 3/8”-16

hEx NutS

Center bearing bracket

Power Drill

7/16” Socket

Driver

level

tape Measure

Pencil

1/4” torx bit

Measure to locate the center of the door

and mark a vertical pencil line on the

mounting surface above the door, to

indicate the center line of the door. then,

measure from the center of the bearing, in

one of the end bearing brackets, DOWN to

the top of the door. using that dimension,

measure uP from the top of the door

and mark a horizontal pencil line on the

mounting surface, intersecting the vertical

pencil line. Now align the edge of the

center bearing bracket along the vertical

pencil line on the mounting surface. Center

the bearing bracket on the horizontal

line. this will ensure the torsion tube is

level between the center and end bearing

brackets. attach the center bearing bracket,

in this location, to the mounting surface,

using (2) 5/16” x 2” lag screws and

(1) 5/16” x 2” tamper-resistant lag screw.

IMPORTANT: uSE thE 5/16” x 2” taMPER-

RESIStaNt laG SCREW ONly If MOuNtING

SuRfaCE MOuNtED OVER MaSONRy.

taMPER-RESIStaNt laG SCREW MuSt bE

attaChED thROuGh thE bOttOM hOlE

Of thE CENtER bEaRING bRaCkEt.

VERtICal lINE

MOuNtING SuRfaCE

Equal DIStaNCE

CENtER Of

END bEaRING

bRaCkEt

hORIzONtal lINE

CENtER bEaRING

bRaCkEt

CENtER

bEaRING

bRaCkEt

(2) 5/16” x 2”

laG SCREWS

MOuNtING

SuRfaCE

hORIzONtal lINE

VERtICal

lINE

12

13

(1) 5/16” x 2”

taMPER-RESIStaNt laG SCREW

OR (1) 5/16” x 2” laG SCREW

Advertising