Preparing for the installation, Code compliance, Installation tools and materials – Xantrex Technology ACCB-L User Manual

Page 24

Advertising
background image

Installation

2–2

973-0031-01-01 Rev A

Preparing for the Installation

Code Compliance

Governing installation codes vary depending on the location and type of
installation. Electrical installations must meet local and national wiring codes.
Installations of this equipment should only be performed by skilled personnel
such as qualified electricians and Certified Renewable Energy (RE) System
Installers. For a list of Xantrex Certified RE dealers, please visit our website at
www.XantrexREdealers.com.

Installation Tools and Materials

Tools Required

The following tools may be required for installing this equipment:

❐

Wire strippers

❐

Assorted open-end wrenches or socket wrench and fittings

❐

Torque wrench

❐

Electrical tape

❐

Multimeter (AC/DC volts, frequency)

❐

Assorted Phillips screw drivers

❐

Allen/Hex head driver set

❐

Slotted screw driver

❐

Level

❐

Pencil

❐

Utility knife

Hardware /
Materials Required

The following materials may be required for completing this installation:

❐

Conduits (flexible conduit is recommended), bushings, wire nuts, and
appropriate fittings for wire runs

❐

Electrical wire of appropriate size and length

❐

Breaker panels (if used)

❐

Additional circuit breakers (if required)

❐

Ground busses, bars, and/or rods

❐

Six appropriately sized wood screws or lag bolts and washers

Important:

Before installing the Long AC Conduit Box, read all instructions and

cautionary markings located in this guide and in your inverter manual.

Important:

Be sure to obtain the appropriate permits, if necessary, prior to starting this

installation.