Xantrex Technology ACCB-L User Manual

Page 45

Advertising
background image

Wiring for Off-Grid Applications

973-0031-01-01 Rev A

2–23

Step-up Configuration (Deep Well Pump) (120 Vac to 240 Vac)

The following illustration shows the complete wiring for the ACCB-L-L1,
TX Autotransformer, and a SW Plus Inverter for a Step-up Configuration to
provide power for a 240 Vac Load.

Figure 2-18 Wiring an Off-grid Application Using a Single Inverter and TX Autotransformer for a Step-
Up Configuration for a Deep Well Pump Application

Advertising
This manual is related to the following products: