Important safety instructions – Xantrex Technology ACCB-L User Manual

Page 7

Advertising
background image

Safety

973-0031-01-01 Rev A

v

Important Safety Instructions

1. Before installing the Long AC Conduit Box, read all instructions and

cautionary markings on the Long AC Conduit Box and all appropriate
sections of this guide.

2. Do not expose the Long AC Conduit Box to rain, snow, or spray.
3. To reduce risk of fire hazard, do not cover or obstruct the ventilation

openings.

4. Do not install the Long AC Conduit Box in a zero-clearance compartment.

Overheating may result. Minimum clearance for ventilation around the unit
must be twelve inches above and around the sides of the unit. See “Ventilation
Requirements” on page 2–5 for additional information.

5. Do not store anything flammable near the unit. Relocate anything flammable

to another location.

6. Xantrex offers CSA “approved” parts for installation into this product. Parts

purchased elsewhere are subject to approval by the local electrical authority.
See Figure 2-11 on page 2–16 for details.

7. The Long AC Conduit Box is designed to be permanently connected to your

Sine Wave Plus inverter. Xantrex recommends that all wiring be done by a
certified technician or electrician to ensure adherence to the local and national
electrical codes applicable in your application.

8. To avoid a risk of fire and electric shock, make sure that existing wiring is in

good condition and that wire is not undersized. Do not operate the Long AC
Conduit Box, or inverter, with damaged or substandard wiring.

9. To reduce the risk of electrical shock, disconnect all power to the Long AC

Conduit Box and the Sine Wave Plus Inverter/Charger before attempting any
maintenance or cleaning or working on the Long AC Conduit Box.

10. The Long AC Conduit Box is provided with an equipment-grounding bar

which must be connected to the inverter/system equipment ground.

WARNING

This chapter contains important safety and operating instructions for the Sine Wave Plus
Long AC Conduit Box (ACCB-L and ACCB-L-L1) and the ACCB-L-L2 (ACCB-L2-PCK
add-on package). Read and keep this Sine Wave Plus AC Conduit Box Long Owner’s
Guide for future reference.

Advertising
This manual is related to the following products: