Banks Power Dodge Trucks: (Diesel ’94 - 98 5.9L Cummins) Power Systems- PowerPack, Stinger-Plus & Stinger systems User Manual

Page 17

Advertising
background image

Locate the ends of the two intake heater

power cables previously disconnected.

Un-bundle the wire loom containing these

cables until enough cable length is freed up to

comfortably reach the two power studs on the

intake heater housings. also un-bundle the wire

loom portion containing the intake manifold air

temperature sensor pigtail to free up enough of

this cable to reach the sensor. plug the pigtail

on the temperature sensor and reconnect one

of the intake heater power cables to each of the

power studs on the intake heater housings using

the factory hardware. Re-bundle any other wiring

back into the wire loom jackets and secure with

electrical tape as required.
NoTE: before slipping any boost tubes and the

corresponding hoses, into position, ensure that

all connection ends are clean and free of any oil

residue and contaminates. Clean compressor

outlet and all connection points with a non-oil

based solvent such as acetone, mineral Spirits,

Denatured alcohol or Lacquer Thinner. Read and

follow the manufactures operation instruction for

non-oil based solvent cleaner.

Loosen the hose clamp at the bottom of the

factory boost tube and remove the boost

tube. Install the new boost tube provided with

the straight end at the bottom and the bend at the

top. Rotate the tube such that the bend is aligned

properly with the inlet to the TwinRam manifold

and reinstall the factory hump hose. Retighten

all the hose clamps. bolt the dipstick tube and

bracket to the top of the TwinRam manifold using

the factory bolt.

on EGR models, install the EGR crossover

tube using the steel spacer and two gaskets

provided onto the exhaust manifold with two 8mm

x 45mm hex bolts and four circle lock washers

provided. Note that the circle-lock washers must

be used in pairs and be installed with their ramped

sides facing each other. Leave bolts finger tight at

this time. See figure 11 and 16.

Install the EGR valve, aluminum EGR extension

casting and two conical seal rings to the free end

of the crossover tube using two 8mm x 90mm

bolts and four circle lock washers provided. Leave

bolts finger tight. bolt the EGR valve to the flange

on the side of the TwinRam manifold with a new

gasket provided and the two factory mounting

bolts. after checking all EGR components for best

alignment, tighten all EGR system bolts.

Remount EGR vacuum regulator solenoid to bracket

at front of baseplate using the factory bolt, then

reconnect solenoid wiring and EGR vacuum hose.

for powerpack and Twin-Ram manifold installation,

proceed to Step 70.

66.

68.

67.

figure 16

figure 15

17

p.N. 96384 V.3.0

Advertising