Banks Power Dodge Trucks: (Diesel ’94 - 98 5.9L Cummins) Power Systems- PowerPack, Stinger-Plus & Stinger systems User Manual

Page 6

Advertising
background image

align the compressor outlet with the

intercooler hose adapter and tighten the

clamp. Tighten the turbine housing clamp plate

bolts to 11.3N-m (100 in-lb.) torque.

Spin the turbocharger shaft to make sure it

turns freely. If not, loosen the turbine clamp

plate bolts and check for misalignment between the

turbine housing and turbocharger center section.

Retighten bolts and check again.

Use the new gasket provided to connect

the turbocharger oil drain tube to the

turbocharger. make sure the turbocharger oil

drain flange is clean and free of any old gasket

material. Tighten the drain flange bolts to 24N-m

(18 ft.lbs.) torque. NoTE: If the bolts encounter

excessive resistance prior to seating against the

flange, check for paint build up in the threads of

the turbo bearing housing. The threads may need

to be chased with an 8mm x 1.25 metric tap.

Reconnect and tighten the turbo oil supply

hose.

BOOST GAUGE INSTALLATION
Choose a suitable location under the

lower edge of the dash panel for mounting

the instrument panel provided where it can

be conveniently viewed by the driver. This will

typically be above and slightly to the right of the

accelerator pedal.

NoTE: molded instrument consoles for top-

of-dash mounting and additional gauges are

available through Gale banks Engineering.

Using the panel as a template, drill two

3

16

diameter holes in the dash and mount the

panel with two no. 10 x

1

2

” machine screws, nuts

and star washers provided.

Locate and remove the

1

8

” NpT pipe plug

on the driver’s side of the intake manifold

as shown in figure 5. Install the

1

8

” NpT male x

1

8

” compression tube adapter at this location. Use

Teflon tape or sealant on the pipe thread end of

the adapter fitting.

26.

27.

28.

32.

31.

30.

29.

figure 4

6

p.N. 96384 V.3.0

Advertising