Non-egr model shown – Banks Power Dodge Trucks: (Diesel ’94 - 98 5.9L Cummins) Power Systems- PowerPack, Stinger-Plus & Stinger systems User Manual

Page 8

Advertising
background image

40.

Slip the ring terminals on the end of the

leadwire cable over the studs on the

pyrometer. Connect the yellow wire to the +

terminal and the red wire to the other terminal. If

the leadwires are accidentally reversed, the gauge

will read backwards. Install one flat washer, one

lock washer, and one 10-32 hex nut on each stud

and tighten.

GAUGE LIGHTING

41.

Snap the light sockets into the back of

each gauge if not already installed.

Connect one wire from each light to a good

ground location under the dash, such as metal

dash support brackets where other wires may

already be grounded. Connect the remaining

light wires together, then to an 18-ga. or larger

wire connected to the headlight circuit, or to the

factory instrument light circuit. wiring and

terminals for gauge lighting are not supplied with

the system.

Install the air inlet tube (from the air cleaner

housing) and the turbo exhaust pipe

onto the turbocharger. Reattach the wastegate

actuator boost line using a crimp lock clamp

provided.

for quick-Turbo installation only, proceed to CHECkING

ENGINE pERfoRmaNCE.

on exhaust gas recirculation (EGR) models,

unbolt the EGR crossover tube from the

exhaust manifold and the EGR valve. Remove and

set aside for later use. Disconnect the vacuum

supply to the EGR valve, and unbolt the valve from

the air inlet casting. Set aside for later use. on all

models loosen the upper hose clamp on the boost

tube hose joint at the air inlet casting. Unbolt

the dipstick tube clamp from the inlet casting,

then unbolt and remove the inlet casting from

the engine. Retain the inlet casting gasket if it is

in good condition (a replacement is provided if

required). Cover the intake manifold opening and

the open end of the boost tube with clean rags to

prevent foreign object entry. (See figure 6)

for Stinger and Stinger-plus installation, proceed to

oTTomIND INSTaLLaTIoN.

INTAKE MANIFOLD COVER REMOVAL

Disconnect two large lead wires attached

to the stud terminals on top of the manifold

cover next to the air inlet flange. Loosen the tube

nuts at both ends of all six fuel injection lines.

Remove the two bolts from the intake manifold cover

that retain the fuel injection line clamp brackets.

Remove the injection lines as an assembly. It is very

important that no dirt or debris be introduced to the

fuel system while the injector lines are removed.

place the plastic caps provided over each injector

nozzle and each fitting on the injection pump. Set

the injector lines aside in a clean place.

Unplug the air temperature sensor located

in the intake manifold cover. on EGR

models, unplug the wiring to the EGR vacuum

regulator solenoid. Remove the remaining

manifold cover bolts and remove the manifold

cover. make note of the various bolt lengths and

their locations. Cover the cavity in the cylinder

45.

42.

43.

44.

fIGURE 6

NoN-EGR
moDEL
SHowN

8

p.N. 96384 V.3.0

Advertising