13 plumbing (double-shot), Egt thermocouple – Banks Power Universal Car & Truck: (Gas or Diesel ’50 - 14 Universal) Water-Methanol: Straight-Shot and Double Shot, Vehicle specific applications User Manual

Page 13

Advertising
background image

97651 v.1.0

13

Plumbing (Double-Shot)

: Route and secure tub-

ing where it will not interfere with

moving or hot engine components.

Avoid sharp turns that may kink

tubing and sharp edges that may

damage tubing.

: Cut tubing using

a Pocket or X-Acto knife to avoid

pinching the tubing. Pinching the

tubing will cause it to not seat

properly.

1.

Secure one end of 1/4” Nylon tubing

(P/N 45140) into Push-Lock fitting on high

capacity tank by firmly pushing tubing into

Push-Lock fitting. Carefully pull on tubing

to ensure tubing is secured properly.

2.

Route tubing to injection pump

inlet. Cut tubing, allowing approximately

1/2” for securing into injection pump.

Properly secure tubing into injection pump

inlet.

: Make all cuts as

square as possible to avoid leaks.

3.

Route tubing from injection pump out-

let to port #1 of “Y” fitting (P/N 45123).

Properly cut tubing and secure into “Y”

fitting. See Figure 29

4.

Secure tubing in port #2 of “Y” fitting

and route tubing to inlet of check valve.

Properly cut and secure tubing in Push-

Lock check valve.

5.

Secure tubing in port #3 of “Y” fitting

and route tubing to “IN” port of solenoid.

Properly cut and secure tubing in Push-

Lock on solenoid. See Figure 30

6.

Secure tubing in outlet of check valve

and route to the first injection nozzle

assembly. Properly cut tubing and secure

into injection nozzle assembly.

7.

For two injection nozzles, secure tub-

ing in Push-Lock fitting of solenoid labeled

“OUT” and route to the second injection

nozzle assembly. Properly cut tubing and

secure into injection nozzle assembly.

8.

For three injection nozzles, secure

tubing in Push-Lock fitting of solenoid

labeled “OUT” and route to port #1 of “Y”

fitting (P/N 45123). Properly cut tubing

and secure in “Y” fitting. Secure tubing

in port #2 of “Y” fitting and route tubing

to the second injection nozzle assembly.

Properly cut tubing and secure into injec-

tion nozzle assembly. Repeat for the third

injection nozzle assembly using the #3

port of the “Y” fitting.

EGT Thermocouple

: An EGT thermocouple (P/N

63042) is only provided in the Double-Shot

system. If you purchased the Straight-

Shot system, proceed to the Wiring

and Controller section. See Figure 31

1.

The thermocouple monitors the tem-

perature of the exhaust gases entering

Figure 29

Figure 30

Outlet

Inlet

Advertising