Injection nozzle(s) – Banks Power Universal Car & Truck: (Gas or Diesel ’50 - 14 Universal) Water-Methanol: Straight-Shot and Double Shot, Vehicle specific applications User Manual

Page 8

Advertising
background image

8

97651 v.1.0

3.

Thread straight Push-Lock fittings

(P/N 45120) into both ports of sole-

noid. Tighten two turns past hand tight.

See Figure 14

4.

Use provided bolts (P/N 91118), nuts

(P/N 91110), and washers (P/N 91102) to

mount solenoid bracket in your vehicle.

See Figure 15

5.

Use provided screws (P/N 91725)

and washers (P/N 91826) to mount

the solenoid onto solenoid bracket.

See Figure 16 and 17

Injection Nozzle(s)

: If your vehicle is

equipped with a late model Banks

Monster Ram, you do not have to

drill and tap your intake duct as

the Monster Ram has the proper

threaded ports.

1.

Injection nozzle(s) (P/N 45081-45090)

should be mounted in your air intake

duct, post-intercooler (if equipped) and

approximately 6” before throttle body (if

equipped) where possible. When engine

is cool, mark the location on your air

intake duct where injection nozzle(s) will

be installed so that they will not interfere

with moving or hot engine components.

See Figure 19-22

: If installing multiple

injection nozzles, we recommend

separating the injection nozzles by

at least 3” to avoid crossing spray

patterns. See Figure 18

2.

Remove air intake duct and cover

engine and intake tube with clean rags to

avoid getting debris into your engine.

: Intake duct can

be drilled and threaded while on

engine ONLY if you can ensure that

no debris will enter engine or intake

tube. We highly recommend remov-

ing intake duct from vehicle.

3.

Use a center punch to mark the hole

locations and keep the drill bit from wan-

dering. Use a 11/32” drill bit to drill a hole

at marked location(s). Drill perpendicu-

lar to the intake duct surface to ensure

Figure 14

Figure 15

Figure 16

Figure 17

Figure 18

Optional

Primary Stage

Solenoid

Shown

Advertising