Center collar placement roof beam splice, Center collar placement, Roof beam splice – Grain Systems Bin Accessories PNEG-1859 User Manual
Page 50
![background image](/manuals/277514/50/background.png)
9. 2.66" Commercial Tank Roof Instructions
50
PNEG-1859 2.66" Corrugation 135' Diameter Tank with 50 PSF Snow Roof
Center Collar Placement
With two (2) sidewall rings in place, position the center collar at a height of 39' - 11-7/8" to the bottom of
the center collar as shown
Figure 9C
Roof Beam Splice
Splice upper (CRP-7144), middle (CRP-7076) and lower (CRP-7160) roof beams together using
3/4" x 3" bolts (S-8127) and nut (S-234). Note the orientation of the splice plate. The extra 3/8" material
that protrudes below the roof beam flange should match up to its mating beam and be orientated down
after assembly to the center collar and tension plate coupler. NOTE: The top of each roof beam is color
coded with paint and should have a sticker stating “TOP”.
Figure 9D