Z-collar assembly (continued), 2.66" commercial tank roof instructions – Grain Systems Bin Accessories PNEG-1859 User Manual

Page 59

Advertising
background image

9. 2.66" Commercial Tank Roof Instructions

PNEG-1859 2.66" Corrugation 135' Diameter Tank with 50 PSF Snow Roof

59

Z-Collar Assembly (Continued)

(Refer to Figure 9L on Page 58.)

Attach all Z-collars to roof beams using 1/2" x 1-1/2" bolts (S-3728), nuts (S-3729) and washer (S-2121)
on the top only. Leave the bolt loose on the D1 Z-collar (CRP-6344). This bolt will also be used when
placing the roof panel. The part numbers for the Z-collars are as follows:

To splice one Z-collar to the next, use two (2) 1/2" x 1-1/2" bolts (S-3728), nut (S-3729) and washer
(S-2121) on the top and bottom. (See detail splice

in Figure 9L on Page 58

.)

Location

Part #

Qty

A1

CRP-6367

5

B1

CRP-6451

15

B2

CRP-7143

15

C1

CRP-6452

15

D1

CRP-6344

15

Advertising