7. Procedure

20

PNEG-1798 Tower and T-Series Dryers Vaporizer

7.3.4. The inlet is the bottom of the coil and the outlet is the top, the lines can be crossed over outside

the burner can as necessary to get the correct vertical arrangement started downward as soon
as reasonably possible with the best positioning possible. There are no set rules or procedure for
this, this is a ‘contractor to field run’ item depending on space, fittings and good judgement.

See Figure 7K,

Figure 7L below and

Figure 7M on Page 21

for a dryer where the piping was

crossed over to get the final vertical arrangement once the piping exited the screen window.

Figure 7K Piping has started on the opposite side of what is desired.

Notice the 2" burner line at the bottom center of the photo.

Figure 7L The liquid line on the left has been reduced from 1-1/4" to the 3/4" diameter we need

and the piping now exits the inside of the burner can with the 2" burner line located in the center

at the bottom and the 1-1/4" vapor line on the right.