8. TD-VIP-01 Data Sheet Selection

PNEG-1798 Tower and T-Series Dryers Vaporizer

31

Signatures for Completion of Leak Test

Test Technician: _______________________________________ Date: _________________

Supervisor: ____________________________________________ Date: _________________

Vaporizer Pressure Leak Test Data (Continued)

Test Performers Names and Completion Date

Step #

Information

Recorded Data

Initials/Date

7.4.27 on Page 28

1. Disconnect hose at 3/4" manual valve.

2. ‘OPEN’ the valve.

3. Verify 0 PSIG on test gauge.

1.

2.

3. PSIG

1.

2.

3.

7.4.28 on Page 28

3/4" Manual isolation valve ‘CLOSED’.

7.4.29 on Page 28

0-300 PSIG test gauge and fittings removed from 2" x 1" reducer.

7.4.30 on Page 28

3 Prong cord removed from receptacle and wires disconnected from
ASCO solenoid.

7.4.31 on Page 28

Solenoid wires re-connected to field wires (If applicable)
mark as ‘N/A’ if not.

7.4.32 on Page 28

High pressure hose and regulator removed from nitrogen cylinder.

7.4.33 on Page 28

Connect the 2" x 1" fitting from the vaporizer loop to the 2" inlet fitting
of the high pressure regulator.

7.4.34 on Page 28

Verify all steps of this section are complete and initialed and signed.

Test Performer Name(s)

Company Name

Test Completion Date

Test Performer’s Initials