11. Roof Assembly

PNEG-4030 40 Series 27' and 30' Diameter Bins

83

Roof Assembly for 27' through 30' Bins (Continued)

NOTE: Refer to seal clip details on

Page 85

.

NOTE:

See Page 82

for assembling the peak cap and slide rods.

Prior to assembly of roof and center collar, you will need to position the flashing so the cap hold-down
is in line with roof ladder. Two (2) holes per flashing section are provided for the hold-down bracket.
Pre-assemble center collar and flashing pieces together before attaching roof panels to flashing. TIGHTEN
ALL BOLTS, EXCEPT FOR THE TWO (2) LOWER FLASHING SEAM BOLTS.

(See Figure 11E below

and Figure 11F on Page 84.)

Figure 11E Cross Section View

Ref #

Part #

Description

Ref #

Part #

Description

A

CRP-4608

Center Collar
18', 24' through 54' Roof - Red (3)

F

CRP-5325

Yellow - Rev. Roll Large
Eave Clip

B

S-3611

5/16" x 1" Flange nuts

G

CRP-5327

Red - Rev. Roll Intermediate
Eave Clip

C

S-10250

Flange Bolts

H

Roof Step

D

Flashing

(See Figure 11F on Page 84.)

I

To Concrete

E

IMPORTANT: Start roof channel at
second hole from the bottom of roof rib.

J

CRP-4692

Roof Channel (2)

Ref #

Part #

Description

Ref #

Part #

Description

A

CRP-4602

Peak Cap

E

CRP-4606

Slide Rods (2)

B

PR-331

Peak Cap Handle

F

CRP-4608

Center Collar (3)

C

CRP-4654

Cap Hold-Down

G

Roof Sheet

D

CRP-4689

27'-48' Cap Hold-Down Bracket

H

Roof Flashing