Grain Systems Bin Accessories PNEG-1096 User Manual

Page 20

Advertising
background image

20

PNEG-1096 Ladder, Safety Cage, & Platforms

2.66 INSIDE STIFFENED

LS-121 LADDER

STANDOFFS

16" TYP.

18.3/4"

INSIDE LADDER STANDOFFS
REQUIREMENTS

Field drilling will be necessary for the standoffs
located in the middle of the sidewall sheet. Drill
2 holes 3/8" diameter directly in line with the
horizontal seam holes 18 3/4" apart. Continue
down the sidewall with standoffs at every 16"
spacing. Refer to the diagrams at the left.

INSIDE LADDER PLACEMENT

The inside ladder package includes
the ladders and double the amount
of standoffs. Begin by positioning the
ladder directly under the manhole roof
panel and place the standoffs every 16"
vertically on the sidewall sheets using
the horizontal seam holes for every other
hole location. Us 5/16" x 3/4" bin bolts
to attach the standoffs to the sidewall of
the grain bin. Refer to the diagram on
the right.

Manway Sheet

Inside Ladder

INSIDE OF GRAIN BIN

REV. 5-25-95

Advertising