00 outside stiffened inside ladder placement, Inside ladder standoff requirements – Grain Systems Bin Accessories PNEG-1096 User Manual

Page 53

Advertising
background image

53

PNEG-1096 Ladder, Safety Cage, & Platforms

4.00 OUTSIDE STIFFENED

INSIDE LADDER PLACEMENT

The inside ladder package includes the

ladder

and double the amount of standoffs as the

outside ladder package. Begin by positioning
the ladder directly under the manhole roof
panel and place the standoffs every 22" verti-
cally on the sidewall sheets using the horizon-
tal seam holes for every other hole location.
Use 5/16" x 3/4" bin bolts to attach the standoffs
to the sidewall of the grain bin. Refer to the
diagrams to the left and below.

MANWAY SHEET

INSIDE LADDER

INSIDE OF GRAIN BIN

INSIDE LADDER STANDOFF
REQUIREMENTS

Field drilling will be necessary for the
standoffs located in the middle of the
sidewall sheet. Drill 2 holes 3/8" diameter
directly in line with the horizontal seam
holes 18.3/4" apart. Continue down the
sidewall with standoffs at every 22"
spacing. Refer to the diagram.

NOTE: In Commercial Hopper Tanks with

inside ladders install brackets at 8"
spacing in the bottom two rings.

REV. 9/20/00

LS-121 LADDER

STANDOFFS

22" TYP.

18.3/4"