Drop kit installation – Grain Systems Bin Accessories PNEG-914 User Manual
Page 23
5. Installation
PNEG-914 Flex-Flo
23
Drop Kit Installation
1. Wrap the rotary slide over the outlet hole and around the auger tube. Position the slides with
cut-out facing in the same direction for all drops so that the slides will operate the same when the
ropes are pulled.
2. Thread the rope through the ends of the rotary slide as shown in
and tie the slide ends
together so that the ends of the rope are the same length.
Figure 5M Drop Kit Installation
3. Slide rope through molded guide holes in drop halves.
4. Position the drop halves around the rotary slide and attach both halves together with the hardware
provided as shown in
.
Figure 5N
5. Test the rotary slide. Pull on one rope at a time. Check the rotary slide to be sure it is centered over
the outlet hole.
6. Slide the rotary slide to its open position by pulling the appropriate rope. Mark the short rope end at
the point where it enters the guide hole. Tie a knot on the rope at the mark. The location of the knot
will show at a glance if the slide is open or closed.