Chapter 7: roof assembly – Grain Systems Tanks PNEG-4105 User Manual

Page 106

Advertising
background image

Chapter 7: Roof Assembly

Figure 7-22 Center collar assembly

A

Center collar (CTR-0089 and CTR-0091)

E

1/2 x 1-3/4 in. flange bolt (S-10252)

B

1/2 in. flange nut (S-10253)

F

Center collar splice plate (CTR-0023)

C

1/2 x 1-3/4 in. flange bolt (S-10252)

G

1/2 in. flange nut (S-10253)

D

Center collar splice plate (CTR-0097)

I

Outer holes

4. When assembling the opposite side of the center collar, install another center collar splice plate (D) to

the inside portion on the center collar (A).

5. Install flange bolts (E) and flange nuts (B) to the six outer holes (I) of the center collar splice plate (D).

NOTE: The configuration will be different on each side due to the odd number of roof rafters. The

remaining open holes in the center collar splice plate (D) will be used when installing the A-
frame rafters to the center collar (A).

6. Install another center collar splice plate (F) to the underside of the center collar (A), and install flange

bolts (C) and flange nuts (G).

106

Pneg-4105 105 Ft Diameter 40-Series Bin

Advertising