Chapter 7: roof assembly – Grain Systems Tanks PNEG-4105 User Manual

Page 121

Advertising
background image

Chapter 7: Roof Assembly

Figure 7-36 Installing the upper roof panels

B

Exposed gap

E

5/16 in. flange nut (S-3611)

C

Upper roof panel (CTR-0112)

F

A-frame roof rafters

D

5/16-18 x 1 flange bolt with sealing washer
(S-10260)

9. When the initial two lower panels and two upper panels are installed, fill in the exposed gaps, by

installing three additional lower roof panels (A) (as shown) overlapping each lower roof panel on the
right, adjusting the lower roof panels as needed.

10.Install flange bolts (D) and flange nuts (E) securing the overlapping lower panels.

NOTE: To ensure each lower roof panel is overlapping the existing roof panel previously installed,

slightly lift the side rib of the previous lower roof panel, allowing the new lower roof panel to
be tucked under the previous roof panel.

Pneg-4105 105 Ft Diameter 40-Series Bin

121

Advertising