Chapter 7: Roof Assembly

Table 7-1 A-frame installation sequence and temperature cable locations for 105 ft diameter bin

A-frame number

Rafter Number

Temp Cable Number

Radius Location

A1

R5

R6

T14

42.4 ft

A2

R21

R22

T9

28.3 ft

A3

R15

R16

A4

R31

R32

T23

42.4 ft

A5

R11

R12

T16

42.4 ft

A6

R25

T10

28.3 ft

R26

T21

42.4 ft

A7

R1

T1

10.3 ft

R2

A8

R7

T6

28.3 ft

R8

A9

R27

T4

10.3 ft

R28

A10

R17

T8

28.3 ft

R18

T18

42.4 ft

A11

R29

T11

28.3 ft

R30

T22

42.4 ft

A12

R13

T7

28.3 ft

R14

T17

42.4 ft

A13

R3

T5

28.3 ft

R4

T13

42.4 ft

A14

R23

T20

42.4 ft

R24

A15

R9

T15

42.4 ft

R10

T2

10.3 ft

A16

R19

T3

10.3 ft

R20

T19

42.4 ft

A17

R33

R34

T12

28.3 ft

R35

T24

42.4 ft

NA

Attach to center collar

(Optional)

T25

5 ft

84

Pneg-4105 105 Ft Diameter 40-Series Bin