Chapter 7: Roof Assembly

Assembling the Rafters

For the larger bins (90–105 ft.) each rafter will consist of a two piece design and will need to be spliced
together for assembling the A-frames.

1. Locate an upper rafter (A) and a lower rafter (B), and find the series of twelve holes on each end of

the upper rafter (A) and a lower rafter (B).

NOTE: Assemble rafters with the flanges facing in the same direction.

2. Place the lower rafter (B) to the outside mating surface of the upper rafter (A), and align the series of

twelve holes together.

3. Install flange bolts (C) and flange nuts (D), and tighten hardware to the recommended torque specifi-

cations. See

Bolt Torque Specifications, page 25

.

Figure 7-6 A-frame assembly (Note: complete A-frame assembly shown for clarity)

A

Upper rafter (CTR-0093)

C

1/2 x 1-3/4 in. flange bolt (S-10252)

B

Lower rafter (CTR-0092)

D

1/2 in. flange nut (S-10253)

After You Finish
Repeat this procedure for the remaining rafters.