![background image](/manuals/277680/92/background.png)
Figure 7-14 Purlin location 6
A
Left-hand roof rafter (CTR-0093)
F
1/2 x 1-3/4 in. flange bolt (S-10252)
B
1/2 x 1-3/4 in. flange bolt (S-10252)
G
1/2 in. flange nut (S-10253)
C
Left-hand roof rafter (CTR-0093)
H
Purlin (CTR-0104)
D
Right purlin clip (CTR-0100)
I
1/2 in. flange nut (S-10253)
E
Left purlin clip (CTR-0099)
Assembling Purlin Number 5
Purlin number 5 is located fifth purlin from the eave.
Before You Begin
Place two roof rafters on the ground with roof panel holes facing up. Several A-frame assemblies will have
X-bracing installed and be placed periodically throughout the perimeter of the roof. Determine if X-bracing
is being installed and note those steps in this procedure.
92
Pneg-4105 105 Ft Diameter 40-Series Bin