Installation, Chapter 5 installation, Installation of cable wheel & coupler connector – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1375 User Manual

Page 11

Advertising
background image

PNEG-1375 Farm/Commercial Distributor Cable Control

11

5. INSTALLATION

Installation of Cable Wheel & Coupler Connector

Once the distributor has been installed the installation of the cable controls can begin. First install
the cable wheel. This cable wheel mounts to the control pipe coming from the bottom of the
distributor using (3) 3/8"-16 x 1-1/2" Bolts (S-7521) and (3) 3/8-16 whiz nuts (S-968).

Figure 5A

Advertising