Installation – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1375 User Manual

Page 19

Advertising
background image

PNEG-1375 Farm/Commercial Distributor Cable Control

19

5. INSTALLATION

When installing, mark the center of the cable. Start at the Upper Control Wheel. Feed the cable
into the holes in the side of the control wheel (as shown in

Figure 5K

) until the center of the cable

is between the two holes in the side. Wrap each end of the cable one full wrap around wheel.

Figure 5K

Run both ends of the cable through the cable guides

(See Figure 5L)

, continue down through the

intermediate cable guides along trunking

(See Figure 5M on Page 20)

, down to the lower cable

wheel. Wrap each end of the cable 1 full wrap and then cable clamp both ends

(See Figure 5N on Page 21)

.

Cable 2, Spout Release Cable:

This cable is used to release the index trigger so that the spout can be turned. This cable should
be able to reach from the control handle at the bottom side of the lower control wheel

(See Figure 5M on Page 20)

, up over the center pulley of the cable guide assembly, under the

connector pulley assembly, and tie off at the index trigger

(See Figure 5L)

. Allow some extra

cable to be able to tie off at both ends.

Figure 5L

Advertising