Upper cable guide assembly, Installation – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1375 User Manual

Page 14

Advertising
background image

14

PNEG-1375 Farm/Commercial Distributor Cable Control

5. INSTALLATION

Upper Cable Guide Assembly

Once the location of the upper cable guide assembly is determined it must be fastened to the
trunking. The assembly of the clamp band and upper cable guide assembly (DFB0388) is shown
in the

Figure 5D

& Figure 5E

. The 1/2" x 2" bolts and nuts that fasten the clamp bands to the

upper cable guide assembly are provide in the hardware package (FC-DCG-HDW). These
clamp bands vary depending on what size leg you have. Refer to the

Table below

to see what

clamp bands should be used.

Note: Use caution when tightening hardware, DO NOT overtighten and collapse trunking.

Figure 5D Trunking Removed for Clarity

Figure 5E Trunking Removed for Clarity

Pulley Dia.

Clamp Band

Qty

10"

GSB10174

2

16", 24", 30" & 36" Pulleys

Part #

Qty

Clamp Band

DSP16002

2

Clamp w/Rod Weldment

DSP16005

1

Advertising